We are all moved in and the animals are really enjoying their new temporary home. We hope you’ll stop by and visit us here at 1589 VT Route 14S in East Montpelier. And mark your calendar: April 10th for our Grand Opening! for more details please visit our website: www.cvhumane.com

Come See Our New Home!
March 5, 2010
WE’RE MOVING!!!!
February 15, 2010We will be CLOSED at both locations from 2/16 through 2/18 to finish moving, reorganizing and training. During this time our phone, email and website service will be interrupted. Please be patient and we will be back up and running in no time!
We will reopen with regular hours on Friday 2/19 at the new building on Route 14 in East Montpelier.

Week 21
February 8, 2010It’s almost time to move! As you can see, we have staff and volunteers working like crazy to get the final touches done. The floors are in everywhere, we’re painting almost every room, supplies are getting unpacked, and the staff is getting really excited. There’s a lot of work left to do so call if you have some spare time!
- Wendy Cleans
- Ready to Install!
- Ready and Waiting for Volunteers!
- Robyn (staff) and Craig (volunteer) inspect a freshly painted wall.
- Volunteers Craig and Tyler work with staff member Megan to move kennels.
- Getting Ready!
- Waiting for the paint to dry.
- Room for stray animals almost ready!

Week 20
February 2, 2010This week was pretty exciting! We scheduled final move preparations (see our Home Page!) and had a lot of progress in the building. Sinks went into all of the cat areas, counters were installed in the medical room, and the dog kennels went in! The end is in sight and we are getting pretty excited. We need volunteers to help with painting, cleaning and finishing touches. Call Amber at 476-3811 x27 if you have some spare time!
- Sink for Cleaning Adoptable Cat Areas
- Medical Room
- Kennel with Kuranda Bed
- New Kennels for Adoptable Dogs
- Kennels for Stray Dogs

Week 19
January 25, 2010This week things are starting to really come together with the new epoxy flooring that was poured in the dog kennels and in the new cat wing. This amazing floor is anti-microbial and easy to clean, making it prefect for the new shelter. The carpenters also completed the kitchen in the meeting room and are working on cabinets in the medical room.
- The new floor is ready for kennels!
- We can now install the kennel walls and doors.
- The new floor in the cat wing.
- The kitchen is in place in the meeting room.

Week 18
January 19, 2010Let there be light! This week things really started to brighten up around the new shelter. Robyn and the volunteers continued the grand task of painting, and the electrician began installing the light fixtures.
Also happening this week… the new epoxy floors will be poured in the kennels and the cat wing. We will have pictures of the new floor next week. We’re getting close! We’d like to thank everyone for their support during this project. We could use volunteers to help with painting, moving, and cleaning. Contact amber@cvhumane.com or 476-3811 ex 27
- The meeting room painted with lights
- The other end of the meeting room.
- Looking down the cat wing, painting almost finished.
- Lighting and blue tape removed.

Week 17
January 12, 2010This week I thought we’d show some of the before and now pictures. The pictures at this point can’t begin to show all the little things behind the scenes that are going on. Volunteers have been helping out to get the meeting room primed and finishing up the trim in the cat wing. The restaurant size stainless steel sinks for the cat cleaning room and the animal kitchen also arrived this week.
- The new cat kennels. (They came with the building)
- The meeting room before and now.
- The shelter manager’s office before and now.
- The upstairs offices before and now.

Week 16
January 5, 2010After the holiday break, things are really moving forward. Volunteers lead by staff member Robyn have been hard at work painting the cat wing. The bright colors make the rooms cheerful and will help the cats really stand out. This week the new kennels will arrive and the crew is working on more electric, ventilation, sheet rock and painting. Preparations have began over at our current location for the move. We are cleaning and organizing supplies, junk drawers, closets and sheds. After over 30 years here on Mekklesen Hill, we have a lot of work to do!
- Looking down the hall of the cat wing.
- The green room!
- Looking across to the blue room.
- Sunshine yellow.